Initial Inspection
Please unisolate to confirm inverter is operational
Please edit the "Is the system operational" dropdown once you have access
For safety reasons please ensure system is isolated before continuing
Roof Details
Array 1
Array 2
Array 3
Array 4
Visual Inspection
Section
Please ensure all tools are removed and roof is clear
Please ensure all glass is cleaned up and removed from site.
Solar Panel Information
End Checklist
Please ensure this is completed before leaving the premises
Please ensure this is completed before leaving the premises
Please store racking in a safe place to eliminate fall or trip hazzards
Please ensure the system remains isolated